ANALISIS PRODUKTIVITAS PEKERJA KONSTRUKSI PADA PEKERJAAN BETON BERTULANG
DOI:
https://doi.org/10.31959/js.v9i2.369Keywords:
produktivitas, work sampling, labour utilization factors (LUF), faktor produktivitasAbstract
References
Andi, 2003, Handout mata kuliah Construction Project Administration, Universitas Petra, Indonesia
Boy, R.A, 1986, Improving Total Corporate Productivity, Thomson Learning, 1986
Jenkins, J.L., and Orth, D.L. 2003 ., Productivity Improvement through Work Sampling, AACE International Transactions, CS51.
Oglesby. C.H, Parker H.W., and Howell G.A, 1989, Productivity Improvement In Construction, McGraw-Hill
Olomolaiye,P.O, Jayawardane, A.K.W,. and Harris,FC. , Construction Prosuctivity Management, Mc-Graw-Hill,1998
Pilcher,R, 1992, Priciples of Construction Management 3rd ed, McGraw-Hill, Inc, Singapore
Siagian Sondang P., 2002. Kiat Meningkatkan Produktivitas Kerja. Cetakan Pertama, PT. Rineka Cipta, Jakarta
Soeharto, Iman. 1995. Manajemen Proyek : Dari Konseptual Sampai Operasional. Jakarta : Erlangga.
Thomas, H.R., Riley, D.R., and Sanvido, V.E.,1999, Loss of Labor Productivity due to Delivery Methods and Weather, Journal of Construction Engineering and Management, Vol. 125 No. 1pp. 39-46.
Tuti Sarma Sinaga, Melita Sembiting 2004, Work Sampling: Studi Kasus Pekerjaan Bertender Pada Sebuah Café. Universitas Sumatera Utara.
Wibowo, K.D., dan Prasetyo, A., Analisa Labor Utilization Rate pada Proyek “X†dan “Y†dengan Menggunakan Metode Worksampling, Skripsi, Universitas Kristen Petra, Indonesia, 2004.







