LESBASA, Gabriel C. A.; MARANTIKA, Meyke; MAELISSA, Nelda; SERANG, Rudi. ANALISA PERBANDINGAN WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) DAN PDM (PRECEDENCE DIAGRAM METHOD) (Studi Kasus : Rehabilitasi dan Renovasi Sarana Prasarana SD Negeri Waemasing, Kec. Waesama, Kab. Buru Selatan). Journal Agregate, [S. l.], v. 1, n. 1, p. 1–8, 2022. Disponível em: https://www.ejournal-polnam.ac.id/index.php/JA/article/view/1135. Acesso em: 3 feb. 2026.